Days between two dates with DAYS
DAYS returns the number of days from a start date to an end date, and it takes the end date first, which is the argument order people most often get backwards.
=DAYS(B2,A2)The sheet: Projects sheet: column A is Start date and column B is End date. You want the number of days between them in column C.
How it works, step by step
- 01A2 holds the start date, for example 2026-03-01, and B2 holds the end date, for example 2026-03-29.
- 02DAYS(B2,A2) subtracts the start from the end. The end date goes first.
- 03The result is 28, the number of days between the two dates, not counting the start day itself.
- 04Format the cell as General or Number. If it shows as a date, the formula is correct but the formatting is not.
The same logic in four tools
=DAYS(B2,A2)=DAYS(B2,A2)-- PostgreSQL: date minus date gives whole days.
SELECT end_date - start_date AS days_between FROM projects;
-- MySQL / SQL Server:
-- DATEDIFF(end_date, start_date) / DATEDIFF(day, start_date, end_date)import pandas as pd
projects["start_date"] = pd.to_datetime(projects["start_date"])
projects["end_date"] = pd.to_datetime(projects["end_date"])
projects["days_between"] = (projects["end_date"] - projects["start_date"]).dt.daysMistakes that break it
- !Dates stored as text return #VALUE!. Check with =ISNUMBER(A2). A real date is a number, and left-aligned dates are usually text.
- !If the cells include a time of day, the result has a fraction, such as 28.5. Wrap the dates in INT() for whole days.
- !The order matters. DAYS(A2,B2) gives a negative number when the start is earlier than the end.
- !DAYS counts calendar days. For working days only, use NETWORKDAYS, and for whole months or years use DATEDIF.
Common questions
- How do I calculate the number of days between two dates in Excel?
- Subtract the earlier date from the later one, =B2-A2, or use =DAYS(B2,A2). Both return the same whole number when the cells contain no times.
- Does DAYS include the start date?
- No. From March 1 to March 2, DAYS returns 1. Add 1 if you want to count both the first and the last day.
- How do I get days between dates in Python?
- Convert both columns with pd.to_datetime, subtract them, and read .dt.days from the result.